SAE ARP748B PDF Download

$24.00

Gas Turbine Engine Power Take-Off Pad Requirements (Stabilized: Feb 2014)
standard by SAE International, 02/06/2014

Document Format: PDF

Description

This document summarizes the need for power take-off pads on gas turbine engines intended for helicopter power plant installations.

Product Details

Published:
02/06/2014
File Size:
1 file , 490 KB
Redline File Size:
2 files , 2.2 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus

Documents History