Description
The City of Temple (City) constructed a 12 MGD membrane water treatment plant (MWTP) in 2004 tosupplement its existing 29.7 MGD conventional water treatment plant (CWTP). After approximately fouryears of operation, plant operators observed a gradual decrease in permeability and inefficient cleaning,resulting in an inability of the MWTP to reach the designed production capacity. In 2008, a plantevaluation was conducted to investigate the cause of the poor membrane performance. The major processstreams of the MWTP were investigated and a fiber cleaning study and module autopsy was performed toidentify potential fouling agents. Key recommendations from this study included a new enhanced clean-in-place protocol to recover the original membrane capacity, membrane filtration system adjustments, anddesign modifications to improve operation and minimize membrane fouling. Includes 2 references, tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2009
- Number of Pages:
- 10
- File Size:
- 1 file , 910 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus