AWWA ACE65105 PDF Download

$14.00

Bid Day – Calm, Chaos, or Calamity: Who Sets the Tone?
Conference Proceeding by American Water Works Association, 06/01/2007

Document Format: PDF

Description

This powerpoint presentation asks the question: “How can Owners/Engineers procure equipment or systems from qualified suppliers on a competitive basis without the method of procurement itself becoming an impediment to the success of the project?” It lists the required components of a procurement method, or bid form, and discusses bid form options that include: Conventional Open Bid;Base Bid;Base Bid + Deductive Alternate(s);Evaluated Bid; and, Pre-Selection Bid.

Product Details

Edition:
Vol. – No.
Published:
06/01/2007
Number of Pages:
15
File Size:
1 file , 610 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus